Reparation of a Natural Waterway
In July 2019, Scaada was engaged to repair an engineered waterway, and take an inefficient system, and make it beautiful.
Reverse Osmosis Unit Installation Completed
A collective project between our Environmental, Consulting and Engineering and Fabrication teams created this total solution for a client facing significant pressure from authorities as a result of an undesired outcome of their daily production.
Site Remediation Nears Completion
SCAADA Group is finishing the final stages of its site remediation Phase One works in Ballarat.
Asbestos Contamination On Construction Site
A major civil developer encountered unexpected and significant asbestos contamination on their construction site shutting down works.
Asbestos Contaminated Soil Remediated
Using known methods and practical process, schedule delay was reduced, and the client saved $600K.
Melbourne Site Water Remediation – Turning Turbid Water Clean
Scaada Environmental Division engineered a process that took our clients site water from 400 NTU to 25 NTU in five days.
Soil Remediation – Turning Category C Soil to EPA Fill
Scaada Group used modern techniques and engineered outcomes, saving our client $1.2M. Our Client was faced with a $1.5M categorised soil problem on an active construction site.
Managing the asbestos risk with an asbestos register
Recently, a client asked me about asbestos risk and the regulations around management of a commercial property. There are unknown requirements in the Work Safe Victoria Code of Compliance.
Business resilience
Ever considered if something happened to your business how would it affect your clients? Most of us conduct business based on relationships, but what if you lost your head office services for 48 hours.
Asbestos compliance and regulations
Did you know that it is a legal requirement to have a hazardous material audit conducted for all significant renovations and all demolitions?